STAGE 1
10-15 WORKING DAYS
LAYOUT AND STYLE SOLUTIONS FOR THE SPACE
▪ Planning and stylistic solutions for space
▪ Consultation, preparation of technical specifications for design
▪ Measurements of premises with a visit to the site, photo recording and study of the site
▪ A measured plan with reference to existing utility lines
▪ Layout solution with furniture and equipment arrangement (2-3 options)
▪ Discussions, adjustments
▪ Coordination of the selected layout option with the customer
▪ Analysis of the style solution of the space (selection of possible finishing options and interior items)
▪ Coordination of the concept of the future interior with the customer

STAGE 3
Up to 30 working days
LAYOUT AND STYLE SOLUTIONS FOR THE SPACE
▪ Measurement plan
▪ Furniture arrangement plan
▪ Plan of erected and dismantled partitions
▪ Plumbing equipment arrangement plan
▪ Ceiling plan
▪ Ceiling molding installation plan
▪ Lighting fixtures arrangement plan, lighting outlets binding
▪ Switch connection plan indicating the inclusion of groups of lamps
▪ Layout plan for socket groups, low-current and electrical outlets
▪ Floor heating layout plan with thermostats reference
▪ Interior decoration scheme
▪ Developments along the walls of the main rooms with references to gypsum products
▪ Layouts of wet rooms with tile layout
▪ Drawings of necessary joinery (doors, windows, furniture)
STAGE 4
Equipment
Personalized approximate calculation of the cost of filling the premises.
This calculation includes all furniture, equipment and finishing materials (heating appliances, plumbing, lighting, electrical fittings, household appliances, wallpaper, tiles, paint, decorative plaster, floor coverings, etc.).
Sending requests to the specified persons to receive no more than 2 commercial offers containing information on the cost and delivery times of components.
Selection of furniture and finishing materials in our comfortable office in the 1st district of Vienna.


STAGE 5
The cost of support is calculated depending on the amount of construction work and the volume of the project.
Turnkey all-in project support
▪ Consultations and monitoring of compliance with interior design solutions
▪ Regular visits by the author of the design project to the site (4-5 times a month)
▪ Consultation of the construction team on drawings
▪ Making adjustments to working drawings and sketches (which may arise during the execution of the project)
▪ Negotiating with suppliers if necessary
STAGE 6
Project implementation management
▪ Author's supervision: control over the implementation of the design project with verification of compliance of the completed work with the documentation in accordance with the contract.
▪ Interaction with the management company: resolving all issues related to implementation on the territory of the facility.
▪ Drawing up a work schedule: to ensure timely involvement of contractors and prevent downtime during project implementation.
▪ Search for contractors: selection of specialists, request for at least two commercial proposals, interaction with selected contractors.
▪ Coordination of project participants
▪ Construction control: daily contact with the foreman, weekly reports to the customer.
▪ Acceptance of furniture, equipment and materials
▪ Organization of final cleaning

STAGE 2
21-48 WORKING DAYS
VISUALIZATION
▪ Visualization of all rooms
▪ Discussion, adjustments
▪ Coordination of sketches with the customer